Geotechnical report guide

Geotechnical Report for a Hillside Lot

Building on a slope is where a geotechnical report matters most. The report has to show that the slope is stable now and will stay stable with a building on it.

What is different about a slope

On flat ground the main questions are bearing capacity and settlement. On a hillside the report also has to address whether the slope itself can move. Building departments routinely require a geotechnical report for hillside construction, and lots in state mapped landslide zones need a site specific hazard evaluation.

What the investigation covers

  • Depth to firm soil or bedrock across the slope
  • Slope stability analysis
  • Evidence of past slides or soil creep
  • Seismic hazard evaluation, including earthquake induced landslides
  • Foundation recommendations, often drilled piers and grade beams
  • Retaining wall design values
  • Surface and subsurface drainage

Access

Steep and wooded lots are hard to reach with a truck mounted rig. Our in-house drilling crew is equipped with a portable tripod for these sites.

Common questions

Does a hillside report take longer?

Our typical turnaround is two to three weeks. A complex slope can need more borings and more analysis, and we say so in the proposal.

How do I get a quote?

Send us the project address and a basic site plan if you have one. That is enough for an initial consultation and a fixed-fee proposal, and quote requests are answered the same day.

Ready for a quote?

Send the address and a basic site plan. Quote requests are answered the same day.