Geotechnical Report Process and Timeline
From the first call to a signed report, the work has five steps. Our typical turnaround is two to three weeks.
The five steps
- 1
Proposal
You send the address and a basic site plan. We send a fixed-fee proposal, the same day.
- 2
Field exploration
Our in-house drilling crew drills the borings and takes samples. We can typically mobilize within 48 to 72 hours of a signed contract.
- 3
Laboratory testing
The samples are tested in our own lab to ASTM and AASHTO standards. We do not wait on an outside lab.
- 4
Engineering analysis
The engineer works out bearing capacity, settlement, seismic parameters and any hazard analysis the site needs, and writes the recommendations.
- 5
Signed report
A licensed Professional Engineer reviews and signs the report for permit submission.
Why it is faster with one team
The drilling crew, the laboratory and the engineers are all in house. Each handoff to an outside company adds waiting time, and we do not have those handoffs.
After the report
If the building department has comments on the report during plan check, our engineers respond to them. During construction we provide compaction and field density testing.
Common questions
How soon can you start?
We can typically mobilize within 48 to 72 hours of a signed contract.
What are your hours?
Monday through Saturday, 7 AM to 7 PM. Call (408) 596-3896.
More geotechnical report guides
Related services
Geotechnical reports by city
Ready for a quote?
Send the address and a basic site plan. Quote requests are answered the same day.