Geotechnical report guide
Geotechnical Report for a New Home
A new house is the project building departments most consistently ask a geotechnical report for. The report sets the foundation type before the structural drawings are finished.
Why it is required
The California Building Code, in Section 1803, sets out when a geotechnical investigation is required and what it must address. Most building departments in California require a report for a new structure with a foundation, and the requirement is firmest in seismic hazard zones and on hillsides.
What we investigate
- Subsurface soil profile from borings across the building footprint
- Laboratory testing of the samples in our own lab
- Groundwater level
- Expansive soil and settlement potential
- Liquefaction and landslide hazards where the lot is in a mapped zone
- Seismic design parameters for the structural engineer
What you get
The report recommends a foundation type, such as a conventional footing, a mat slab or drilled piers and grade beams, and gives the bearing capacity, settlement estimates and lateral values needed to design it. It also covers site grading, compaction and drainage.
When to order it
Order it before the structural engineer starts. The foundation design depends on the report, and a report that arrives late means drawings get redone. Our typical turnaround is two to three weeks.
Common questions
What do you need to start?
Send us the project address and a basic site plan if you have one. That is enough for an initial consultation and a fixed-fee proposal, and quote requests are answered the same day.
Do you coordinate with my structural engineer?
Yes. We work closely with structural engineers so the foundation recommendations fit the design.
What if the building department asks for revisions?
Our engineers respond to plan check comments that concern the report.