A geotechnical report tells the people designing your project what the ground under it is made of and how to build on it. Here is what the document contains and who uses each part.
The short version
A geotechnical report, also called a soils report or a geotechnical investigation report, is an engineering document prepared from a site investigation. Someone drills or digs at the site, takes soil samples, tests them in a lab, and an engineer turns the results into design recommendations.
Your structural engineer uses it to size the foundation. Your building department uses it to confirm the design matches the ground. Your contractor uses it for grading, compaction and drainage.
What you will find inside
- Project and site description: what is being built and what the lot looks like today.
- Field exploration: where the borings were drilled, how deep, and what was found.
- Boring logs: a drawing of the soil layers at each boring location.
- Laboratory results: moisture, plasticity, expansion potential and other tests run on the samples.
- Groundwater: whether water was found and at what depth.
- Seismic design parameters under the California Building Code.
- Geologic hazards: liquefaction, landslides and fault rupture, where they apply.
- Foundation recommendations: foundation type, bearing capacity and expected settlement.
- Design values for retaining walls: lateral earth pressure and friction.
- Grading, compaction and drainage recommendations.
Who signs it
Every report we issue is reviewed and signed by a licensed Professional Engineer for permit submission. The signature and stamp are what make it an official document a building department will accept.
What a report is not
It is not a structural design. The structural engineer designs the foundation from the values in the report. It is not an environmental report either: a geotechnical report looks at how soil behaves under load, not at contamination.
Common questions
Is a soils report the same thing as a geotechnical report?
In everyday use, yes. Building departments, engineers and contractors use soils report, soil report, geotechnical report and geotechnical investigation for the same kind of document.
How long is a geotechnical report valid?
Generally three to five years, although a building department may ask for an update if site conditions or the building code have changed significantly.
How long does it take to get one?
Our typical turnaround is two to three weeks.
More geotechnical report guides
Related services
Geotechnical reports by city
Ready for a quote?
Send the address and a basic site plan. Quote requests are answered the same day.