Geotechnical report guide

Geotechnical Report: What It Is and When You Need One

A geotechnical report evaluates the soil and geologic conditions of a building site and tells your engineer how to build on it. These guides explain the report by project type, in plain language.

The basics

A geotechnical report is prepared by a licensed engineer from a site investigation: borings are drilled, soil samples are tested in a lab, and the results become foundation design recommendations. It is also called a soils report or a geotechnical investigation report.

Most building departments in California require one for a structure with a foundation, including new homes, ADUs, pools and retaining walls, especially in seismic hazard zones and on hillsides. Your building department makes the final call for your lot.

What you get from California Soil Testing Inc

  • Borings and sampling by our in-house drilling crew
  • Project specific laboratory testing in our own lab, to ASTM and AASHTO standards
  • Seismic design parameters and hazard evaluation
  • Foundation, grading and drainage recommendations
  • Reviewed and signed by a licensed Professional Engineer for permit submission
  • A typical turnaround of two to three weeks

Geotechnical report questions

What is a geotechnical report?

A geotechnical report is an engineering document, prepared by a licensed engineer, that evaluates the soil and geologic conditions of a building site. It gives the data and recommendations needed to design the foundation safely.

Is a geotechnical report the same as a soils report?

In everyday use, yes. Soils report, soil report, geotechnical report and geotechnical investigation all describe the same kind of document.

When do I need a geotechnical report in California?

Most building departments in California require one for a structure with a foundation, including new homes, ADUs, pools and retaining walls, especially in seismic hazard zones and on hillsides. Your building department makes the final call for your lot.

How long does a geotechnical report take?

Our typical turnaround is two to three weeks. Many firms take six to eight weeks. Having the drilling crew and the laboratory in house is what keeps ours short.

How long is a geotechnical report valid?

Generally three to five years. A building department may ask for an update if site conditions or the building code have changed significantly.

Need a geotechnical report?

Free consultation and a fixed-fee proposal. Quote requests are answered the same day.

Hi Dev